Sunday, November 12, 2023

Construction Update #11 - The Track Gang, View Blocks & Ridgway

 

The Track Gang arrives in Placerville

 November 8, 2023

The Test Train - P-B-L Rio Grande 2-8-0 #346 and a P-B-L Rio Grande boxcar.

I use Midwest HO Scale cork roadbed on the Sn3 RGS 1st District.  It is glued down with yellow carpenter's glue.

I use a sanding block to smooth the top of the cork and contour the edges.

Leads are soldered to the bottom of every other section of flex track.  Attaching the leads to the bottom of the rail makes them virtually invisible.  I file the bottom of the rail to give it some tooth and then tin both the bottom of the rail and the leads,


The leads are then soldered to the bottom of the rail;


I glue the track down with thin layer of clear Loctite Polyseamseal,  The Polyseamseal, an acrylic adhesive caulk, goes on white but dries clear.  In my area, neither Home Depot nor Lowes has Polyseamseal but I can normally find it at my local Ace Hardware.  Pins are used to hold the track in place until the caulk dries.

I used to solder my leads to the bus but not any more.  Now I am using Wago 221 Series Lever Nuts.  These simple lever connectors make it easy to connect different wire types and sizes.  They come in 2, 3 and 5 conductor sizes.  They are reusable, made in Germany and you can buy them on Amazon.  The 5 conductor size is shown below.  The larger wire is the bus, the smaller ones are the leads/drops.  The average cost is about 60 cents.

I use a meter and test for continuity and shorts as I go.

After about an hour, I remove the pins, clean the track and run my train!


Turnouts

All of my turnouts are built from Fast Track fixtures and glued in place with Polyseamseal.  Caboose Hobbies ground throws are being used on all but a couple of turnouts that can't be easily be reached.  I was able to salvage most of the turnouts from my previous Sn3 layout so they are being reused.  After they were removed from the old layout I made sure they were straight and gauged properly.  A lot of the old wood ties were replaced as were some of the printed circuit board ties.  I do drop a lead from each of the insulated frogs even though my locomotives don't require them.  The 1st District locomotives are all equipped with Tsunami2 sound decoders and TCS KA1 or KA2 current keepers.  But, eventually all the turnouts will be equipped with Tam Valley "frog juicers" just in case and for visiting power that may not be equipped with current keepers.



A Plan for Ridgway

November 11, 2023
 
 
I have had several comments about the lack of a yard or engine service facility on the layout.  I originally left the idea of modeling Ridgway off the plan due to the lack of space and my desire to model several other scenes as closely as possible.  One viewer of the blog even sent me a "suggested" plan.  Unfortunately, there just wasn't enough room to lay out the yard and engine facility to closely replicate the prototype.  Regardless, here is what I came up with.  A hillside between Old Placerville and the mainline would hopefully create some perceived distance between Placerville and Ridgway.


The engine facility is pretty much laid out like the prototype but it is flipped horizontally to fit the space.  Since it would be built as a module, it could be flipped back into the proper orientation should it get moved at some point.  The module is 30" deep on the left and 24" deep on the right.  It is 8' long.  The addition of Ridgway would certainly add to operations.  The only real problem with this plan was the need to re-work the Lizard Head wye in the original plan.  But, I had already done that.  The wye in the previous plan was directly above an aisle that required a large duck under.  The changes at Lizard Head and the additional siding between Matterhorn and Trout Lake are shown in the following plan.  The wye on the previous plan has been replaced by a return loop that is located outside the main room. The return loop can be used to turn helpers or complete trains.  The entrances to and from the reverse loop are hidden in the snow shed.  The prototype wye was also in a snow shed so the return loop isn't a huge compromise.  Lizard Head will be on a narrow shelf above the proposed Ridgway and the oversized duck under/swing away is now a single track just inside the door.  (Ridgway and Rico Staging are not shown on this plan)

I would really like to know what you all think...  sdepolo@outlook.com

View Blocks

I have been going back and forth between having and not having view blocks for some time.  I have built layouts, in my existing space (22'x27') with and without view blocks.  While I understand the advantages of view blocks and their ability to create distance between scenes, I tend to prefer layouts without them, especially in smaller rooms, when terrain (hills and mountains) can be used to accomplish the same thing.

The RGS 1st District started out with a view block between the Vance Jct scene and the Bridge 45A/Ophir scene.  I initially cut the view block back about 4' so that the Vance Jct section house and out buildings could be viewed from both sides.  This was somewhat of a compromise since Bridge 45A could also be seen from both sides.  In the end, I decided it was worth it. 

I decided to do a test, with and without a view block, between the north end of Vance Jct and Trout Lake.  The tracks here are about 12" apart and the difference in elevation is about 6".  I installed the back drop and glued some pink foam profiles in place.  I didn't like the result, especially on the Vance Jct side, so the hard board view block between Vance Junction and Ophir/Trout Lake was removed and the profiles were replaced.

Here is how the scene looks from the Trout Lake side without the view block.  I think the scene, without the view block, is more expansive.  Eventually the tree line on the far wall, above Vanadium, is all that will be seen from the Trout Lake side.

Here is the view from the Vance Jct side.  The dividing hills are just tall enough to block a train on the far side.  Again, the hills on far side open up the scene and create distance.  Backdrops on a view block can create depth, especially in photographs, but in my mind eliminating them on a peninsula if possible can be a plus.

 

The Track Gang makes it into Wilson

November 12, 2023
 

As always, you comments, suggestions & questions are welcome

https://sn3rgs.blogspot.com/

Tuesday, October 31, 2023

Construction Update #10 - From Bridge 45A to Trout Lake

 

Bridge 45A

Getting Bridge 45A to fit turned out to be quite a challenge.  I knew at some point in time things would turn out to be a bit difficult when it came to transferring the 1st District plan into reality.  In the case of Bridge 45A, the vertical supports for the scenic divider and valence, that run down the center of the peninsula, are to close to the bridge location.  I gained a few inches by shifting the Ophir module but each additional inch between the offending supports took a way aisle space on the opposite side.  Options include moving the supports which may be possible or eliminating the valance which is probably the best option. The south end of the bridge, along with the turnout that leads to the spur behind the depot, should really be on a curve. Unfortunately I couldn't make that work given my space constraints.  I still need to build the bench work that will support the bridge module.


Ophir

 


At Ophir, construction changes form conventional L-Girder back to removable modules.  The Ophir module is the largest on the layout measuring 4x6 feet.  The track is resting on three and a half inches pink foam.

Looking South

Looking North

There should be enough room to include most of the significant structures to include the house at the end of the trestle, Mrs Skillens, The Oilton Club, the "correct" depot, the tram terminal and the general store.

 

South of the Ophir Loop is the Ophir siding.  It is the shortest siding on the layout; about six feet long.  At one time ore was packed or trucked down to the siding and loaded into box cars.  Mining and general supplies were probably unloaded here too.  In order to add more operating interest, this is how I plan to use the siding.


One feature I had to eliminate from the plan was a good representation of the "High Line" south of Ophir.  My version of the "High Line" will be a couple of short trestles on the 180 degree curve on the end of the peninsula.  

 

Matterhorn

Matterhorn was added to the plan with the last revision.  The San Bernardo Mill (Matterhorn Mill) was located on a spur at Matterhorn along with a RGS section house, bunkhouse and tool shed.  There was never a depot.  The mill is still standing and there are ongoing efforts to stabilize and preserve it including a recent grant from the EPA.  The mill was rebuilt several times and operated sporadically until 1968 with it's most productive year being 1926.

Looking North

In order to include the mill, I had to move the mill spur from the west side of the mainline to the east side (right in this photo).  The Montezuma Lumber Co spur is in the center foreground.    After the Ophir siding turned out to be shorter than I expected, and there was no room to add the siding at Trout Lake, I decided to add a long (Lake Fork Siding) siding between Matterhorn and Trout Lake.

The Lake Fork siding is on the left and Ophir siding is on the right.  The two scenes will eventually be separated by a center divider  The mainline and siding are 59 inches above the floor at this point.  I have kept all the sidings level.


Trout Lake 

 


Looking South

The long siding ends at Trout Lake which will be represented by the shoreline along the right side of the tracks.  The water tank will be tucked into the side of the hill on the inside of the curve.  The grade, from the south end of the siding, up to Lizard Head is 2%.



Looking North

The track here loops around the Lake Trout shore line towards the current "end of track" that is just short of the future Lizard Head Summit duck under. 

Pretty good progress, I think, for 58 days into the project (Construction Start Date - September 3, 2023).
 
As always, your comments, suggestions & questions are welcome


Sunday, October 22, 2023

Construction Update #9 - Revised Track Plan, Death of the Helix & The Right Of Way moves South

Revised Track Plan

October 10,2023
 
Several changes have been made to the original plan.  The first was the addition of Wilson, between Placerville and Vanadium, which was covered in a previous post.  The second change involved the addition of Mattahorn between Ophir and Lizard Head.  While the change reduced the mileage between Vance Jct and Ophir, it allowed for two additional spurs; the Bernardo Mine spur and the Montezuma Lumber spur.  Both spurs will add operating interest to the layout.
 
The next change involved the track layout at Lizard Head.  The wye was moved to the opposite side (correct side) of the mainline and the stock pens were added to the tail of the wye.  As a result of this change, the Rico staging tracks were moved to a second level shelf above the Placerville wye.

Finally, the Telluride reverse loop/staging (not shown on plan) will now be located beneath Matterhorn.  While the new plan sacrifices a little aisle width at a couple of locations, I think the changes are worth a little congestion at a couple of choke points.
 


The Death of a Mushroom

 October 14, 2023

 
It took 4 days, about 6-8 hours a day, but the "mushroom" is finally gone.  About the only good thing that came out of the removal is an abundance of good material that can be used for building the new bench work.  The bench work on the right, the only part that remains, will be used under Vance Junction.

October 15, 2023
 
New bench work starting to go in.  Most of the cabinets have been moved to their final locations.  About 95% of the old bench work was salvaged and being reused.  Given the cost of materials I'm glad, with the exception of the L-Girders, not much glue was used when building the old bench work. I have purchased about 250 feet of high quality 1x4 to build the new modules.


 
October 22 ,2023

After a week, a lot of progress has been made.  The bench bench work, sub roadbed and cork roadbed is in from Placerville through Wilson, Vanadium and Vance Junction to Bridge 45A.  Beyond Bridge 45A the bench work stands at about 85% complete through Ophir and Trout Lake.  What follows is a recap in pictures of progress to date.

Placerville

 
Placerville is located along the 22' along north wall.  Most of the required structures are temporarily set in place to include a ore dump and several warehouses.  The module with the sub roadbed for the wye is also in place (Not shown).

Looking South

Looking North

Looking south along the San Miguel River between Placerville and Wilson.  The radius here is 36".  The minimum radius on the mainline is 30".  The minimum radius on the Telluride Branch is 26"  All those trees were salvaged off the old layout.


Wilson

 
Wilson takes up about 12' along the east wall.  A siding, section house, speeder shed and water tank will be located at Wilson.  I have not been able to find a picture of Wilson so what you see at Wilson is kind of proto-freelanced.
 
Looking South

 
Looking North



Vanadium

 
Vanadium takes up another 12' along the east wall.  There will be a long spur here for servicing the mill.  Based upon my research, the mill received coal and limestone in gondolas,  tank cars(?), and box cars.  The ore was shipped out in box cars.  The mill here was large so it will have to compressed to fit the space.  

Looking South


Looking North



Right of Way between Vanadium and Vance Jct.

 
There is a 1.5% grade south of Vanadium.  The construction here is conventional L-Girder with risers and plywood sub roadbed.  A section of the old layout lives on in the corner.
 

 


Vance Junction

Vance Jct is laid out on one side of the long peninsula.  I have all of the Banta kits to replicate the section house and various out buildings.  I also have the Cristal River kit for the coal pockets.  The ramp on the far right will lead to the coal pockets

Looking South
 

 Looking North
 
 
Looking North - The Vance Jct Section House, Depot (Old Coach) and the outbuildings will be to the right along the single track between the turnouts.  The layout is set up so the depot will be visible from both sides.  The turnout in lower section of the photo leads to the Telluride Branch (Staging),
 

 

Bridges 44A and 45A

 
Bridge 44A is located along the curve on the end of the long peninsula.  The length will have to be reduced the by about 60% and the height by about 30% to fit my space.  Bridge 45A will have to be reduced in length by about 25% to fit the space; the height will be OK since the bench work has been lowered to accommodate the bridge.  The grade here is 2%.

Looking North.  Bridge 44A will be just to the right out of the photo
 
 
Looking North - The future location of Bridge 45A
 

I've been putting in 8 to 10 hours day on the layout for the last week while Pam was away in Kansas City.  She's just got back so I probably won't have quite as much time during the coming week. But, I plan to get the rest of  the bench work, sub roadbed and cork installed between Bridge 44A and Trout Lake  during the next week or so...  We'll see how it goes!
 
 As always, your comments, suggestions and questions are welcome



Sunday, October 8, 2023

Construction Update #8 - Looking South, Upper level Demo & Sn3 Items For Sale or Trade

Headed South

October 2, 2023
 
The HO Scale Preston Miller Yard got removed from the east wall of the room today.  It was built on a 3" layer of foam; 1" over 2".  The top layer (1") cane up in pieces due to the fact it was spot glued to the lower level.  It can be salvaged for building scenery.  The lower layer (2") came up with only some minor damage so it will be used as the base for the new modules where it will be covered with a new layer of 1" foam. 
 
Since the railroad will wind along the San Miguel River here with a hillside in the background I plan to leave just a trace of  the existing backdrop peeking through several layers of actual trees. This wall is almost 27' long  and will be divided into two scenes, Wilson and Vanadium.
 

Wilson

 
After laying out Placerville, I decided that there should be another passing track between staging (Ridgeway) and Vance Junction.  Wilson was located at Milepost 32.6, about .4 of a mile north of Vanadium, and had a 27 car long passing siding.  
 
 
Since I couldn't find a photo or track diagram for Wilson anywhere, I decided it was the perfect location for a "what if" structure I happened to have on hand.  After all, if no one can come up with a actual photo of Wilson then who's to say my little section house and box car addition didn't exist.  I scratch built the main structure and the boxcar addition came from a Design Tech kit.  The model is based upon a structure that stood at Pagosa Junction (Gato) on the D&RGW.  It is shown in yellow on the plan.

 

Extending the line to the South

October 5, 2023

Leaving Placerville, the main line curves to the south along the San Miguel River on a 36" radius.  The right-of-way itself will be obscured from the aisle in a deep cut blasted out of the side of the canyon  The view block will help create distance between Placerville and Wilson.

 
Looking South with Wilson in the foreground.  Vanadium will be located beyond the south end of the siding in the distance.  


The view looking north and the south end of the siding.  The siding will hold a locomotive, about 12 cars and a caboose.  There are no grades between Placerville and Wilson.  South of Wilson, the grade between Wilson, through Vanadium to Vance Junction will be 2%.  All but a couple of inches along the top of those southeastern hills will soon be covered with the rugged terrain associated with southwestern Colorado.  What remains will reduced to not much more than a silhouette with flat white spray paint.
 


Removing the Upper Level

September 8, 2023

I've gone about as far as I can on the lower level without removing what's above.  I am starting with the salvage operation.
 
 
After the removal of the structures, the P-B-L flex track is next.  I think about 50% of it can be removed with little or no damage.  In the future, it will only be used for secondary tracks; spurs & staging.  And of the remaining flex that can't be salvaged intact, I can probably save most of the rail.


 

Items For Sale or Trade

 
Since I have decided to concentrate on the RGS, I have several items I would like to sell or trade (RGS).  If you are seriously interested, I can provide additional photographs.  Prices include shipping and insurance.  sdepolo@outlook.com

P-B-L K-28 #476 Foreground Model.  $1295.00 or trade for Foreground K-27 (except #455, 461 or 463).  Would  also consider trade for RGS #41 Foreground Model.  Original box.


Rio Grande Long Caboose ##0503.  Built from kit with removable roof and interior detail.  $175.00 or trade.  SOLD


PFM Pagosa Jct Combine.  Combine has been modified and is equipped with P-B-L Trucks.  Original Box.  $295 for sale or trade. SOLD
 

Locomotive Servicing Complex.  Consists of P-B-L Chama Lube House, AMB Powerhouse and scratch built coal dock. $200 or Best Offer
 

P-B-L Lube House with details
 

Power House
 

P-B-L C-25 equipped with DCC and Tsunami Sound System. Original Box $1295.00 or trade


As always your comments, suggestions & questions are welcome